I-HOUSE




A. Product specifications
1. Inorganic acrylic resin (agent A) and special inorganic powder (agent B)
2. Pure water-and-cement based material for both roof renovation and new construction with waterproofed results, heat insulation, easy to use and long-lasting life.
B. Packaging and performance
|
Packaging |
Layer thickness and area covered |
|
5 gallons /25 kg (5:20 = A resin : B powder) |
3mm/4-5m2 |
C. Scope of application
Roof, exterior walls, tile repair, leveling, tile filling, and similar usage.
D. Preparation
1. Total cleansing of the surface.
2. Apply by brush a layer of the Crystals 1 m2/0.3kg (requires 50% of water). Drying time: 4 hours.
3. Wet surface prior to application.
4. Usage:
a. After mixing A+B, stir evenly with a blender until obtaining a viscous mixture.
b. After mixing A+B, stir evenly with a b lender and add 10% of water. Scrape with a spatula.
5. Once dried, brush the Crystals as a top coat.
E. Tools
Roller, brush, stone paint, spray gun, trowel.
F. Drying time
Initial setting time: 2 hours. Wait 1 week for the drying reaction to be completed.
G. Storage limit
12months
A. Product specifications
1. Inorganic acrylic resin (agent A) and special inorganic powder (agent B)
2. Pure water-and-cement based material for both roof renovation and new construction with waterproofed results, heat insulation, easy to use and long-lasting life.
B. Packaging and performance
|
Packaging |
Layer thickness and area covered |
|
5 gallons /25 kg (5:20 = A resin : B powder) |
1-2mm/8-10m2 |
C. Scope of application
Roof, exterior walls, tile repair, leveling, tile filling, and similar usage.
D. Preparation
1. Total cleansing of the surface.
2. Apply by brush a layer of the Crystals 1 m2/0.3kg (requires 50% of water). Drying time: 4 hours.
3. Wet surface prior to application.
4. Usage:
a. After mixing A+B, stir evenly with a blender until obtaining a viscous mixture.
b. After mixing A+B, stir evenly with a b lender and add 10% of water. Scrape with a spatula.
5. Once dried, brush the Crystals as a top coat.
E. Tools
Roller, brush, stone paint, spray gun, trowel.
F. Drying time
Initial setting time: 2 hours. Wait 1 week for the drying reaction to be completed.
G. Storage limit
12months
water seepage in rainy days
Indoor heat caused by sun exposure
Electricity bills soar in summer
Waterproofing and thermal insulation of buildings
I have an idea
Waterproof and heat insulation in place
Inorganic crystal ore thermal insulation waterproof material
exempt from beating
Effective thermal insulation
Easy to construct
Environmental safety
Waterproof and moisture-proof
Specification
Application thickness/area
solve your problems
Do you have these problems with your roof and factory?
water seepage in rainy days
High temperature indoors with sun exposure
Large temperature difference between indoor and outdoor
Electricity bills soar in summer
4 easy steps
Waterproof! Thermal Insulation!
Get it right once
Thermal insulation test
Waterproof and heat insulation in place at one time, with a difference of 15 degrees
SGS multiple authentication
actual case

