• Kaohsiung Nanzi Yuanzhong Road - Detached House
  • Kaohsiung Nanzi Yuanzhong Road - Detached House
  • Kaohsiung Nanzi Yuanzhong Road - Detached House
  • Kaohsiung Nanzi Yuanzhong Road - Detached House
  • Kaohsiung Nanzi Yuanzhong Road - Detached House
  • Kaohsiung Nanzi Yuanzhong Road - Detached House

Kaohsiung Nanzi Yuanzhong Road - Detached House


Kaohsiung Nanzi Old Building Exterior Renovation | Match Your Condition First

Nanzi's exterior walls face compound deterioration — not a single problem. Industrial dust × intense UV × summer downpours × densely packed old buildings, plus light salt damage from the Kaohsiung Harbor wind corridor — five forces hitting simultaneously. Without targeted treatment, renovation won't last.


Match Your Building's Problem First

What You're Seeing

What It Means

What Needs to Be Done

Wall turning black, industrial grime won't wash off

Industrial dust bonding to surface long-term

Stone-texture coating or anti-pollution topcoat

Surface powdering / fading / cracking

Intense UV accelerating deterioration

Deep-penetrating primer + weatherproof coating

Paint bubbling / large-scale peeling

Excessive moisture after rainy season

Breathable mineral coating — first choice

Hollow sound when tiles tapped / tiles falling

Thermal expansion + aging mortar destroying adhesion

Remove + re-tile with anchor bolt dual-fix system

Dense cracking / water seeping indoors

Aging mortar + thermal expansion cycles

V-groove cutting + resin fill + fiberglass mesh

Exposed rebar / rust streaks running down wall

Salt + rain corrosion reaching structural layer

Rust removal + anti-rust treatment + mortar repair

Extremely hot indoors on west-facing side

No insulation layer present

Ventilated dry-cladding system


4 Mandatory Inspections Before Any Work Begins

Skip any one of these and problems will reappear after renovation.

  1. Exterior wall deterioration assessment — What is the tile hollow rate? Are tiles lifting in sheets? Is cement mortar crumbling or powdering? Is existing paint peeling across large areas?
  2. Crack classification — Hairline cracks: coating can handle. Over 0.3mm: V-groove + resin fill required. Diagonal cracks: possible structural issue needing separate assessment. Rebar-level cracks: rust removal must come before any repair.
  3. Moisture content reading — Nanzi's frequent summer downpours keep moisture levels high. Over 8–12% means all coatings will bubble. Must be confirmed before work begins.
  4. Water ingress source mapping — Most common in Nanzi: window frame corners, aged window silicone, balcony slab joints, A/C pipe penetrations, and metal fixture screw holes.

5 Methods Compared — Find the Right Fit for Your Building

AHigh-Durability Elastic Coating

Best cost-performance ratio. Best for: cement walls, heavy cracking, severe surface powdering Nanzi's heavy industrial dust means anti-pollution transparent topcoat must be added — without it, the wall turns black within one to two years UV-resistant Absorbs hairline crack movement Good waterproofing Budget-friendly Moist substrate causes bubbling moisture content must be confirmed before work begins


BMineral Coating / Silicate Coating

First choice for walls with high moisture, chronic bubbling, or repeated repainting failure Breathable system lets moisture disperse outward — eliminates bubbling at the root cause No bubbling No powdering UV-resistant Strong anti-pollution performance Higher material cost strict substrate preparation required


CStone-Texture Coating

Strongest visual transformation — simultaneously solves Nanzi's industrial dust problem Stone-like appearance with strong anti-pollution performance — ideal for facades near industrial zones and main roads Strong anti-pollution Weatherproof and rain-resistant Fade-resistant Significant appearance upgrade Mid-to-high cost requires crew with proven application experience


DFull Tile Removal + Re-tiling

Required when tiles are hollow or already falling Nanzi's severe thermal expansion cycles make this mandatory: elastic mortar + mechanical anchor bolts (dual-fix system) Patching tiles without anchor bolts means they will fall again


EDry-Cladding System (Most Durable + Strongest Insulation)

Solves industrial dust, light salt damage, and indoor heat in one project Materials: aluminum panels, fiber cement board, honeycomb panels Resists industrial dust and light salt damage Ventilation gap significantly lowers indoor temperature Won't bubble, crack, or fall Highest upfront cost specialist crew required


Standard 11-Step Construction Process

1.  Scaffolding setup + safety measures

2.  High-pressure cleaning at 150 bar (removes dirt, dust, loose coating)

3.  Hollow tile inspection → removal → mortar patching

4.  V-groove crack cutting + resin injection fill

5.  Exposed rebar: rust removal + anti-rust treatment

6.  Deep-penetrating primer coat (improves adhesion)

7.  Full-surface fiberglass mesh reinforcement (strongly recommended)

8.  Main coating in 2–3 layers (elastic / mineral / stone-texture)

9.  Anti-pollution transparent topcoat (essential for Nanzi's industrial dust environment)

10. Window frame, rain shield, and pipe edge sealing (backer rod + silicone + cover strip)

11. Post-completion water-spray leak test (photo/video documentation required)


2026 Nanzi Pricing Reference

Method

Price per Ping (NTD)

High-durability elastic coating

600 – 1,600

Mineral coating / silicate coating

1,500 – 3,200

Stone-texture coating

1,200 – 3,500

Full tile removal + re-tiling

3,500 – 6,500

EIFS thermal insulation system

5,000 – 10,000

Dry-cladding panel system

6,500 – 13,000


Copy & Send This to Any Contractor When Requesting a Quote

I need an exterior wall renovation quote for an old building in Nanzi, Kaohsiung. Please provide:

  1. On-site inspection report: hollow tile rate, crack classification, moisture content
  2. Recommended method (coating / tile / cladding) with reasoning
  3. Material specifications: coating product, anchor bolt type, fiberglass mesh specs
  4. Construction sequence and project timeline
  5. Itemized quote: scaffolding / substrate repair / coating / edge sealing / debris removal
  6. Warranty terms: water ingress, adhesion failure, color fading — years covered for each
  7. Nanzi or northern Kaohsiung project references (with photos)
  8. Post-completion water-spray test record (photo or video required)

When requesting a quote, please provide first: floor area, current condition photos, and project location.