2024 Construction Challenge: Costs are soaring and work shifts are hard to find! Choose the right exterior wall painting partner to make the project worry-free
2024 Construction Challenge: Costs are soaring and work shifts are hard to find! Choose the right exterior wall painting partner to make the project worry-free
Since the outbreak of Covid-19, the challenges faced by the construction industry have intensified. Since 2020, construction costs have soared like a rocket, with raw material prices rising by more than 30% on average. Coupled with the shortage of human resources and the surge in transportation costs, the pressure on the industry has doubled. In this difficult environment, how to choose a trustworthy exterior wall painting manufacturer has become the key to ensuring the smooth progress of the project!

▲In recent years, construction industry costs have been rising, and there has been a shortage of workers and materials. The lack of workers in the general environment has seriously affected the progress of the project.
1. The sequelae of the global epidemic: rising raw material and transportation costs
During the epidemic, various countries implemented lockdowns, which severely impacted the supply chain of construction materials such as steel and cement. Steel prices once soared 60% to a 20-year high, and these materials are core resources for construction projects. In addition, international transportation costs have doubled and delivery times have been extended, directly pushing up the overall cost of imported materials.
The epidemic has catalyzed the reshoring of Taiwanese businessmen and the transfer of orders in the manufacturing industry, driving an upsurge in industrial plant expansion. At the same time, the government's forward-looking infrastructure, urban renewal and dilapidated reconstruction projects have also exacerbated the imbalance between supply and demand of construction manpower. In particular, the younger generation's indifferent attitude towards construction site work has caused the construction industry to face an unprecedented labor gap.

▲Rising cargo transportation costs have seriously affected the normal operation of the global trade industry
[Double impact of lack of work and lack of materials]
If the shortage of work and materials is not properly dealt with, it may lead to the following risks:
- Project progress is delayed and the risk of default increases
- In order to rush the work, the construction quality may decline
- Tendering becomes more difficult and early planning costs increase
Therefore, it is particularly important to choose a manufacturer with complete management mechanisms and professional capabilities.
[How to choose an exterior wall facelift project? Professional team is the key]The HUA TSAI Paint team will protect your building. In the field of exterior wall painting, the HUA TSAI Paint team is known for its professionalism and quality. From design, material selection to construction management, the entire process is personally handled by a professional team. We provide one-stop services including construction and materials, and use high-performance imitation stone coatings to make the exterior walls not only beautiful, but also waterproof and weather-resistant.
HUA TSAI Paint has been deeply involved in the Taiwan construction market for many years, and has cooperated with well-known builders such as Huayoulian, Fufa, Longteng Construction, Jingcheng Construction, etc. to provide high-quality exterior wall renovation solutions for buildings. We adopt innovative systematic construction methods, which not only shortens the construction period, but also ensures construction quality and reduces subsequent maintenance risks.

▲HUA TSAI PAINTS Industrial Co., Ltd. integrates materials, design and construction, specializing in exterior wall painting projects and waterproofing projects
※ 外牆拉皮須檢測施工基面達到標準
電話 ▏ 07-365-6297
地址 ▏ 高雄市楠梓加工出口區東三街4號
網站 ▏ https://reurl.cc/VzrGqb
Line ▏ https://reurl.cc/MOaYGn